MOF-3 Copper Mining & Smelting Complex
Uzbekistan · 2024 · ENTER Engineering
Contract on file
Project background
Contract MOF-3-EE-SHSHCABLE, signed 26 February 2024, covers a 35-line cable package for the MOF-3 copper mining and smelting complex: medium-voltage XLPE power cable in single- and three-core armoured builds including flame-retardant types, shielded analogue and digital signal cable, and proximity-vibration and RS-485 instrument cable, delivered DAP Tashkent.
Scope recorded
- Cable type
- XLPE/SWA, XLPE/SWA/FR, analogue signal cable, digital signal cable
- Technical requirements
- Power cable supply including HV grades
- Delivery
- DAP Tashkent, Uzbekistan (Incoterms 2020); 30 calendar days from production finish
Product families supplied
This record is supplied from the product families below.
Request a Quote
Have a comparable scope in Uzbekistan?
Send us the destination, the installation conditions and the quantities. We will confirm the constructions that apply and issue a technical and commercial proposal.